PPR for the preparatory period

PPR for the preparatory period is developed for the needs of the construction site in temporary engineering networks, amenity and storage facilities, wheel washing points, fences, human resources, etc., it must also take into account the required placement of temporary roads and access roads, which directly has a significant impact on the efficiency and success of the entire project. Also, the PPR for the preparatory period is developing the opening of warrants for earthworks, the installation of temporary fences and the placement of temporary fences.

PPR for the preparatory period contains:

  • calendar plan for the production of works on the object;
  • building master plan;
  • the schedule for the receipt of building structures, products, materials and equipment at the facility;
  • workforce movement schedule;
  • demand schedule for construction machines and mechanisms;
  • technological schemes for the performance of types of work;
  • layouts of geodetic signs;

an explanatory note containing: decisions on the production of geodetic works; solutions for laying temporary networks of water, heat, power supply and lighting of the construction site and workplaces; description of technology and work sequence; measures to control the quality of construction and installation works; solutions for the production of work in the winter; the need for energy resources; the need and binding of temporary buildings and structures; List of machines, mechanisms, tools, devices; measures to ensure the safety of materials, products, structures and equipment at the construction site; environmental protection measures; measures for labor protection and safety in construction; fire safety requirements; measures in emergency situations; technical and economic indicators.